Work on IceTop 2009/20010: the first half week 

by Hermann Kolanoski


01IMG_0249_sm.jpg
Flight over the Transantarctic Mountains to the South Pole


162.59 KB










02IMG_0471_11.JPG
Arrival at South Pole


438.23 KB










03IMG_0272_sm.jpg
In full ECW gear


278.65 KB










04IMG_0490_12.JPG
The IceTop team, left to right: Hermann, James, Chris


475.16 KB










05IMG_0505_sm.jpg
Preparing the IceTop tanks:
installation of the sunshade frames

143.01 KB










06IMG_0503_sm.jpg
IceTop tanks waiting for preparation


176.92 KB










07IMG_0526_sm.jpg
The boxes for the Freeze Control Units (FCU)


197.39 KB










08IMG_0273_sm.jpg
A tank being moved to the trench (for a station)


193.82 KB










09IMG_0535_sm.jpg
The two tanks of a station in the trench


179.86 KB










10IMG_0297_sm.jpg
Mounting of a Digital Optical Module (DOM) on the holder board


139.83 KB










11IMG_0290_sm.jpg
A mounted DOM


152.34 KB










12IMG_0313_sm.jpg
Rest on Sunday: the cook prepares individual omelettes


233.87 KB











Created by IrfanView