PP Presentation
Upgrade
Why upgrade the detector ?
Operate at Main Injector = Run II
Add solenoid
Add Si detector
Add preshower detectors
Replace tracking system
Upgrade/Improve muon system
Upgrade DAQ/trigger
Main Injector,Tevatron on schedule
Accelerator ready for D0 roll in October 1999
(slide by
Harry Weerts)