Work on IceTop 2009/20010: the first half week
by Hermann Kolanoski
Flight over the Transantarctic Mountains to the South Pole
162.59 KB
Arrival at South Pole
438.23 KB
In full ECW gear
278.65 KB
The IceTop team, left to right: Hermann, James, Chris
475.16 KB
Preparing the IceTop tanks:
installation of the sunshade frames
143.01 KB
IceTop tanks waiting for preparation
176.92 KB
The boxes for the Freeze Control Units (FCU)
197.39 KB
A tank being moved to the trench (for a station)
193.82 KB
The two tanks of a station in the trench
179.86 KB
Mounting of a Digital Optical Module (DOM) on the holder board
139.83 KB
A mounted DOM
152.34 KB
Rest on Sunday: the cook prepares individual omelettes
233.87 KB
Created by IrfanView